• Place your softbox on the ground (speed-ring down), allowing the soft box to naturally open up.
• Use the palm of your hand to press the tension rod down, whilst maintaining the locking ring to the ground.
• Pinch the rounded ferrule and slide it into the locking ring housing. Repeat for all tension rods.
• Place the soft box on the ground (speed-ring up) and twist light fixture into place.
• Mount your fitted fixture onto the light stand.
• Reverse the diffusion material process and place the softbox on the ground, facing down.
• Remove light fixture from the speed ring.
• Flip the softbox so that the interior is facing up, and place back on the ground.
• Brace the locking ring with one hand, press down on the tension rods to release the tension at the ferrule housing on the locking ring.
• Pinch ferrule and pull out while pressing down on the rod. Repeat for all tension rods.